How electrical and mechanical interfaces shape installation decisions on site.
28 Sept 2026
Mechanical ducts, pipes, cable routes and access zones share the same ceiling and plant spaces. Coordinated drawings make these interfaces visible before installation begins.
Review levels, clearances and equipment connections together. A clash found on a drawing can usually be resolved with less disruption than one discovered after installation.
Keep the installation team working from the current approved revision. The final as-built information should reflect what was installed and remain useful to the maintenance team.