Coordinated HVAC, electrical and plumbing installation for construction and fit-outs, from shop drawings and materials through testing and handover.

A combined MEP package brings several building systems into one project scope. Sherif EMW's company profile covers requirements review, quantities, work programmes, material submittals, installation, testing and commissioning for air conditioning, electrical, water supply and drainage.
For a new build, refurbishment or fit-out, the responsibilities need to be clear from the drawings and contract. Sherif can discuss the package, but design liability, authority submissions, specialist works and handover documents must be assigned for each project. Fire systems are outside the current website offer.
Review drawings, specifications, employer requirements and the intended MEP package.
Prepare or review a bill of quantities and a work sequence that fits the wider project programme.
Agree equipment proposals, submittals, shop drawings and interfaces with civil or fit-out work.
Coordinate the agreed air conditioning, electrical, water and drainage works on site.
Define inspections, system tests, commissioning tasks and records required before handover.
Design, installation and coordinated delivery.
Discuss this workThe scope should connect design information, site delivery and handover.
Identify the disciplines, drawings, specifications, programme and responsibilities.
Resolve trade interfaces, materials, shop drawings and access requirements.
Carry out the agreed work and record testing and commissioning for the installed systems.
The company profile describes pricing from drawings and specifications. Provide the current document set and programme so Sherif can confirm the package and quotation basis.
Design review and coordination appear in the company profile. Whether full design responsibility, shop drawings or installation-only delivery applies must be agreed for the project.
Fire maintenance and fire systems are outside this website's current offer. Authority submissions and approvals must be confirmed for each project and assigned to the responsible licensed party.
An agreed project can lead to a separately scoped maintenance arrangement. Covered systems, dates and responsibilities should be recorded in the contract.
Share the property, drawings or equipment details and what you need planned or priced.